Tuzla, Istanbul

Shipped from stock · Maintenance emergencies · Organized packaging

Stock items ready to ship fast, with support for maintenance shutdowns

Standard stainless steel fittings, adapters, hose ends, flanges and valves ready to ship within an average of 1-3 business days, depending on stock; packed separately by product group and size, with protective caps on threads and ports.

Stock items ready to ship fast, with support for maintenance shutdowns

Quick answer

Standard stainless steel fittings in stock are typically ready to ship within 1-3 business days; standard products not in stock are scheduled for production within an average of 5-10 business days. Parts are packed separately by product group and size, and threads and ports are closed with protective caps. For maintenance emergencies, when a photo of the part, its dimensions and the quantity are sent via WhatsApp, the stock check and thread identification are handled in the same conversation.

A hose end that bursts in a rolling mill, a leaking adapter on a ship or an elbow that brings a corrugator line to a halt: in maintenance emergencies, when the part will be on site matters as much as the part itself. Stock for standard products and planned production for custom products are the two pillars of this service. Shipments are dispatched from Tuzla, Istanbul; the delivery method is agreed together at order.

Which products can you ask about stock for?

Stock availability varies by size and period; stock can be checked for standard sizes in the following groups:

  • Stainless steel fittings: straight fittings, elbows and tees; BSP, NPT, UNF/JIC and metric options
  • Nipples, adapters and transition parts
  • Hose end fittings
  • SAE Code 61 and Code 62 flanges and connection parts
  • Ball valves and check valves
  • Instrumentation fittings: union, elbow, tee, connector, adapter

How does fast supply work?

1. Identify the part

If you know the product code, send the code; if not, send a photo of the part, its outside diameter measured with a caliper, and the quantity. If the thread standard is unclear, it is identified at this stage. The wrong part arriving fast costs the maintenance team more time than no part arriving at all.

2. Stock and alternatives check

If the part is in stock, a shipping plan is drawn up. If not, a standard alternative that will do the same job, or a solution that can be manufactured at short notice, is evaluated and communicated together with its lead time. For urgent orders with multiple line items, shipping the in-stock items first and scheduling the rest for production can also be considered.

3. Preparation and final check

Before shipping, quantity, product type and a final visual check are carried out. Threads and ports are closed with protective caps.

4. Packaging and shipping

Products are packed separately by product group and size and labeled by order group. The maintenance team on site can see from the package which part goes to which line.

For planned maintenance shutdowns

If the list of connections to be replaced is shared ahead of an annual overhaul, drydocking or planned shutdown, items not in stock are scheduled for production to match the shutdown date. That way, shutdown day is spent on installation, not on waiting for parts. Preparation goes faster if the list includes product type, thread standard and size, quantity and position in the line.

Why do protection and packaging matter?

The thread and sealing surface of a stainless steel fitting can be rendered unusable by a single knock during transport. Protective caps on threads and ports shield the part against both impact and the ingress of dirt and dust, and prevent contamination from being carried into the hydraulic system. Packing separately by size prevents similar-looking parts from getting mixed up in the field. We recommend leaving the caps in place until installation and removing them just before the part is fitted to the line.

Critical spares list

Keeping a small stock of spares at the plant for connections that fail frequently or cause shutdowns reduces the need for emergency supply. This list typically includes hose assemblies on moving lines, adapters that are frequently removed and refitted, and sealing elements. Once the list is prepared, the same parts can be quickly reordered by code on subsequent orders.

Lead time summary

  • Stock items: ready to ship within an average of 1-3 business days
  • Standard production: production schedule of 5-10 business days on average
  • Made-up hose assembly (to size): an average of 5-15 business days
  • Custom size and project work: an average of 10-20 business days after technical approval

Delivery time is planned according to stock availability, raw material diameter, quantity, thread standard, custom dimensions, and testing and surface finish requirements. When the technical details are fully confirmed, the schedule is set up faster and more reliably.

Applications by sector

Plants where a shutdown means a direct loss of production: press and mill roll hydraulics in rolling mills, corrugator and cutting lines in paper and board mills, maintenance and repair projects in shipyards, between-voyage maintenance on ships and offshore facilities, periodic maintenance of fire suppression systems, and planned shutdowns in chemical and food plants.

Benefits

  • 1-3 business days from stockStandard products in stock are typically ready to ship within 1-3 business days.
  • The right part firstIf the thread standard is unclear, it is identified before shipping.
  • Alternative solutionsFor parts not in stock, a standard alternative or short-run manufacturing is evaluated.
  • Protected deliveryThreads and ports are closed with protective caps; surfaces are not damaged in transit.
  • No mix-upsPacked separately by product group and size, labeled by order group.

Talk to us directly about this service

Faik Güney Contact person

+90 545 206 13 74

Process

How we work

From request to delivery in 5 steps

  1. Request

    The product code, or a photo, dimensions and quantity, are sent.

  2. Identification and stock check

    The thread standard is verified, and stock and alternatives are checked.

  3. Preparation

    Quantity and product type are checked, a final visual inspection is carried out and threads are capped.

  4. Packaging

    Products are packed separately by group and size, and labeled.

  5. Shipping

    Dispatched from Tuzla, Istanbul by the delivery method agreed at order.

Sectors

Sectors we serve with this service

On the sector page, you'll find this service's field-specific applications, recommended products and frequently asked questions.

Marine & Shipping

AISI 316L fittings, hose assemblies, SAE flanges and valves built to withstand salt spray and vibration on deck cranes, windlasses, steering gear, passerelles and engine room lines.

View sector solutions

Shipyards & Ship Repair

Stainless steel pipe, flanges, fittings and hose assemblies, from newbuild piping circuits to drydock overhauls; fast spares from stock for ship crane service teams.

View sector solutions

Offshore & Drilling

AISI 316L hose ends, SAE flanges, adapters and valves for crane, pipe handling, deck machinery and power unit lines on drillships and platforms.

View sector solutions

Oil & Gas

316L twin-ferrule fittings, needle valves, check valves and tubing for wellhead control panels, chemical injection, refinery instrument and sampling lines, and pipeline stations.

View sector solutions

Chemical Processing

Stainless steel fittings, nipples, valves, flanges and hose fittings for chemical transfer and process lines, selected by weighing fluid compatibility, corrosion resistance, temperature and pressure together.

View sector solutions

Food & Beverage

AISI 316/316L fittings, nipples, valves, flanges and hose assemblies for food and beverage lines that call for cleanable surfaces, corrosion resistance and maintenance access.

View sector solutions

Rolling Mills & Heavy Industry

High-pressure hose ends, SAE flanges and adapters built for the high cycling, heat and vibration of presses, mill rolls and hydraulic power units; supplied from stock for emergency maintenance.

View sector solutions

Mining & Mineral Processing

AISI 316L hose ends, SAE flanges, adapters and valves selected for mine water, vibration and abrasion on underground and open-pit machinery, crushing and screening, flotation, leaching and drainage lines.

View sector solutions

Fire Suppression Systems

Neatly laid out, leak-tight stainless steel nipples, fittings, hose assemblies and flange connections that make servicing easier on fire pump sets, control skids and pressurized auxiliary lines.

View sector solutions

Paper & Board Mills

Elbows, tees, adapters, hose fittings and SAE flanges that cut maintenance time for continuously running hydraulic systems on corrugator, roll, cutting and actuator lines.

View sector solutions

17 products

Products we use in this service

JIC 37° Plug & Cap JIC 37° Fittings & Adapters

JIC 37° Plug & Cap

AISI 316L · SAE J514 (JIC 37°)

Details & quote
BSP Male x NPT Male Adapter BSP / NPT Adapters & Nipples

BSP Male x NPT Male Adapter

AISI 316L · ISO 228-1 / ISO 7-1 (BSP) · ASME B1.20.1 (NPT)

Details & quote
BSPT Hex Plug BSP / NPT Adapters & Nipples

BSPT Hex Plug

AISI 316L · ISO 7-1 (BSPT)

Details & quote
BSPT Hex Nipple BSP / NPT Adapters & Nipples

BSPT Hex Nipple

AISI 316L · ISO 7-1 (BSPT)

Details & quote
SAE Blind Flange SAE Flanges (Code 61 / 62)

SAE Blind Flange

AISI 316L · ISO 6162-1 / ISO 6162-2

Details & quote

FAQ

Frequently asked questions

If your question isn't here, message us on WhatsApp with a ready-made message and our technical team will answer directly.

Ask on WhatsApp
How do I find out whether a part is in stock?

Send the product code, or a photo of the part, its caliper measurement and the quantity, via WhatsApp or by phone. Stock availability and the shipping plan are communicated together with confirmation of the thread standard.

How long does it take to prepare a standard product that is not in stock?

Standard products not in stock are scheduled for production within an average of 5-10 business days. In urgent cases, an alternative from stock that will do the same job is also considered.

Can I order in advance for a planned maintenance shutdown?

Yes. If the list of connections to be replaced (product type, thread standard and size, quantity, position in the line) is shared in advance, items not in stock are scheduled for production to match the shutdown date.

How are the products packed?

Threads and ports are closed with protective caps; products are packed separately by product group and size and labeled by order group. Before shipping, quantity, product type and a final visual check are carried out.

I don't know the product code. What should I send?

Just send clear photos of the part from different angles, its outside diameter measured with a caliper, the pitch measured with a thread pitch gauge if available, the quantity and details of the equipment the part is fitted to. The thread standard is identified from this information.

Quote and technical verification

Get a quote for Fast Supply & Shutdown Support

Briefly describe your request; once size, material and lead time are clear, we'll respond with a written quote.

Details that speed up your quote

  • Line size, thread standard and connection type
  • Working pressure, temperature and fluid
  • Quantity and required lead time
  • Technical drawing, sample or field photo, if available

Fields marked * are required.

At least 10 digits including area code, e.g., +90 532 123 45 67

Technical drawing, photo or PDF (optional)

JPG, PNG, WEBP, HEIC, PDF, DWG, DXF · up to 5 files · 2 MB per file, 8 MB total

We'll get back to you as soon as possible. For urgent matters, reach us by phone or via WhatsApp.